Skip to content

0

Request the brief
APSISAcquire First, Hold Signal, Fly Beyond

One Ground,Every Pass.

Stop stitching ground stations together. One network, one console, every pass accounted for.

Ground SegmentMission OperationsScroll
APSISPosition

The window is the whole job.

  • A spacecraft is only reachable for a few minutes at a time.
  • Every layer between you and that window costs you part of it.
  • So we removed the layers instead of managing them.
  • That is Apsis.

One team on the ground, for every pass you fly.

APSISHow a pass runs
Acquire
Track
Command
Deliver

A pass begins long before
the spacecraft clears the horizon

Ephemeris, scheduling and station keeping are resolved hours ahead across the whole network.

First contact is a formality, never a scramble.

Hold the link,
not your breath

Auto-tracking with sub-degree pointing, and a hot spare aperture that can take the pass mid-flight.

Nobody has to watch a needle.

One console for
the entire fleet

Uplink queues, command authentication and telemetry decode share a single operator view.

Two constellations look like one board.

Data on the ground,
already useful

Payload products land in your bucket decoded, catalogued and checksummed.

Minutes after loss of signal, not hours.

01/ 04

APSISService

Continuous Contact

Ground segment, operated end to end, priced per pass.

APSISAbout

About

who we are
31aperturesNine sites, three bands98.6% pass successTrailing twelve months6min to first frameMedian, polar operators

Every orbit
is a deadline.

We run the ground segment as one team with yours — from first light through decommissioning — so your people spend their hours on the mission instead of the plumbing beneath it.

APSISLedger

Ledger

what we changed
Halden Orbital−34 min

Acquisition to first frame, cut from forty minutes to six

A three-satellite imaging constellation was losing its best light to scheduling latency. We rebuilt the tasking path and moved decode to the edge of the network.

Marisel Systems1 rota

Two constellations, one console, no added headcount

Separate operations teams were running incompatible consoles across two programmes. One operator view retired the second rota entirely.

Northgate Imaging0 missed

A hurricane tasking window held without a missed pass

Eleven consecutive days of surge tasking over the Gulf. Hot spare apertures absorbed two station outages without the customer noticing either.

Kite & Ward11 wks

A ground segment handed over in eleven weeks

From letter of intent to operational acceptance before the launch slot moved. Procurement, licensing and rehearsal ran in parallel rather than in series.

Perihelion Labs98.6%

A full year of polar operations at 98.6% pass success

High-latitude weather is the enemy of Ka-band. Band diversity and an honest fallback policy kept the year's numbers boring, which is the point.

Auralis Earth−31%

Downlink costs down thirty-one percent by retiring three stations

Three leased sites were carrying overlapping horizons. Consolidating onto shared apertures paid for the migration inside two quarters.

HALDEN ORBITALMARISEL SYSTEMSNORTHGATE IMAGINGKITE & WARDPERIHELION LABSAURALIS EARTHSOUNDING BOARDTERRA VESPER
APSISCareers

Fly ItWith Us

Operators, RF engineers and schedulers who would rather own the pass than file a ticket about it.

APSISNews
四宫格